Buyer guide · approx. 6 min read

Power plants and high-temperature systems – pipes, fittings and bolting

In short: power-plant steam and feedwater lines need alloyed elevated-temperature steel to EN 10216-2:

  • 13CrMo4-5 and 10CrMo9-10;
  • for the highest temperatures, X10CrMoVNb9-1 (P91) and X10CrWMoVNb9-2 (P92);
  • or their ASTM A335 counterparts.

Every component of the system should be in the same or an equivalent material group:

  • fittings;
  • flanges;
  • elevated-temperature bolting.

Documentation is at least EN 10204 3.1, often 3.2.

This guide is for buyers at power plants, thermal-plant maintenance teams and energy contractors.

What makes power-plant piping special?

  • Very high temperature and pressure over long service lives.
  • Creep. At high temperature, material slowly deforms under sustained load. Alloyed elevated-temperature steels are designed for this.
  • Welding and heat treatment. Alloyed steels need preheating and post-weld heat treatment. Purchased parts must arrive in matching condition and with matching documentation.
  • Strict acceptance. Independent inspection (3.2) and extensive NDT are common.

Material overview

SystemTypical material (EN)ASTM counterpart
General steam, feedwaterP235GH, P265GH, 16Mo3A106 Gr. B / C
Higher-temperature steam13CrMo4-5, 10CrMo9-10A335 P11, P22 (related grades)
Main and reheat steam linesX10CrMoVNb9-1, X10CrWMoVNb9-2A335 P91, P92
High-pressure feedwater15NiCuMoNb5-6-4–

Equivalents are for guidance. The designer and the applicable standard set the exact material and temperature limits.

The complete package

  • Pipes: EN 10216-2 / ASTM A335, seamless, TC2 tested.
  • Fittings: EN 10253-2 or ASME B16.9 (WP11, WP22, WP91, WP92), including heavy wall.
  • Flanges: 16Mo3, 13CrMo4-5, A182 F11 / F22 / F91.
  • Bolting: elevated-temperature studs and nuts (e.g. 21CrMoV5-7, X22CrMoV12-1).
  • Gaskets: graphite or metallic, depending on temperature.
  • Valves: high-pressure gate and check valves, including pressure-seal designs.
  • Heat-exchanger tubes: U-bent for tube bundles.

For nuclear facilities, pipes, fittings and flanges to special codes (e.g. RCC-M) can also be sourced.

Buyer checklist

  1. Grade and standard for every component.
  2. Size: OD × wall; for fittings, the wall at the weld bevel.
  3. Test category: TC2, NDT requirements.
  4. Heat-treatment condition, if specified.
  5. Certificate: 3.1 or 3.2, naming the inspection body.
  6. Ends: bevels to the welding procedure.
  7. Delivery: scheduled to the outage.

Common mistakes

  • Fittings or flanges from a different material group in a P91 line.
  • Non-elevated-temperature bolting in a high-temperature flanged joint.
  • Lead time for 3.2 inspection not included in the schedule.
  • Incomplete end preparation, which causes site rework.

Frequently asked questions

What is P91?

P91 is the ASTM designation of X10CrMoVNb9-1 (1.4903), an alloyed elevated-temperature steel used for very-high-temperature power-plant steam lines.

Do you supply the bolting too?

Yes, elevated-temperature studs and nuts, including custom sizes.

Can you schedule to an outage?

Yes, with time-slot delivery to the outage schedule.

Request a quote

Send your material list and acceptance requirements. We quote pipes, fittings, flanges, bolting and valves in one offer.